Risk Assessment
RAID Log
Tracks four categories of project uncertainty (Risks, Assumptions, Issues, Dependencies) simultaneously
Rubric Type
multiplicative
Complexity
low
Extractor
risk
Required Inputs
SolveRight's AI extractor automatically derives these data points from your decision description:
- ✓risks
- ✓assumptions
- ✓issues
- ✓dependencies
Best For
How RAID Log Works in SolveRight
When you run a decision through SolveRight, RAID Log is one of up to 155 frameworks that analyze your options simultaneously. The AI extractor identifies 4 key data points from your decision description, then the multiplicative rubric computes a normalized 0-100 score for each option. This score is combined with results from other frameworks to produce your overall ranking, with contradiction detection highlighting where RAID Logdisagrees with other methodologies.
RAID Log — Frequently Asked Questions
What is RAID Log?+
When should I use RAID Log?+
How does SolveRight use RAID Log?+
Try RAID Log + 154 More Frameworks
Start Solving Free — 14 Day Pro Trial14-day Pro trial, no credit card required
Related Risk Assessment Frameworks
Risk Assessment Matrix
Maps risks by probability and impact to quantify overall risk exposure
Scenario Planning
Evaluates best-case, worst-case, and most-likely outcomes
Execution Feasibility Assessment
Assesses practical ability to implement each option successfully
Reversibility Assessment
Evaluates how easily a decision can be undone if it fails
FMECA (Failure Mode, Effects, and Criticality Analysis)
Extends FMEA with criticality ranking based on failure probability and consequence severity
Bow-Tie Analysis
Maps causes, controls, and consequences of a hazard event in a single visual model